Last edited by Daim
Monday, May 18, 2020 | History

2 edition of Report on the upper Tana River irrigation project. found in the catalog.

Report on the upper Tana River irrigation project.

Kenya. Hydraulic Branch.

Report on the upper Tana River irrigation project.

by Kenya. Hydraulic Branch.

  • 229 Want to read
  • 11 Currently reading

Published by Printed by the Govt. Printer] in [Nairobi .
Written in English

    Places:
  • Kenya,
  • Tana River watershed.
    • Subjects:
    • Irrigation -- Kenya -- Tana River watershed.

    • Classifications
      LC ClassificationsTC919.K4 K45
      The Physical Object
      Pagination51, 12, 9 p.
      Number of Pages51
      ID Numbers
      Open LibraryOL5459046M
      LC Control Number73161472

      “It has been established that the Upper Tana basin has sufficient water and suitable black soils for the development of 15, acres of rice, 8, acres of red soil for such crops as tomatoes, onions, citrus, beans and fodder for livestock in the vicinity of Mwea,” the report notes.   In the upper Tana River Basin, ecosystem services influence the delivery of water to dams and hence the provision of water for hydropower and irrigation as well as domestic and industrial use. In the lower basin, water-dependent ecosystem services, including fisheries, cultivation and cattle grazing on the river’s floodplains, support the.

      A,brief report on a survey of the fish and fisheries of the Tana river, with speoial reference to the probable.~ffects of the proposed barrages, by serving the pilot irrigation project near Galole but because upper reaches of the Tana. These fish feed principally on the'larger'. The Tana River is located to both Lamu and Tana River counties; it has a core delta that covers an area of ,ha which is mainly in Tana River district. It is classified as one of the largest wetlands in Kenya with rich diversity of flora and fauna and also it is a home for farmers, pastoralists and fishermen.

        I did well in the primary school leaving exams last year and am now fully sponsored by Tana River Life Foundation in Form 1 (Year 9) in Sacred Heart Girls Secondary School in Mpeketoni, Kenya. Thank you all again. Patricia John" And Ali wrote "I am Ali from Bubesa village in Mwina Location of Tana River County Kenya. My mother and brother are. Upper Nzoia Irrigation Scheme: National Irrigation Board: Kakamega. Agriculture, USD ,, New Gogo Falls Dam And Irrigation Project Public Private Partnership, Feasibility study. Tana Athi River Development Authority (TARDA) Agriculture.


Share this book
You might also like
A concise system of English grammar

A concise system of English grammar

Defense, logistics

Defense, logistics

General prosody

General prosody

Soil analysis for advisory purposes

Soil analysis for advisory purposes

A History of flower arranging

A History of flower arranging

Achieving better golf

Achieving better golf

Domesticating the World

Domesticating the World

Updated design equation for swelling of 20% CW AISI 316 SS

Updated design equation for swelling of 20% CW AISI 316 SS

Signals and circuits.

Signals and circuits.

lems affecting educational tourists in Britain

lems affecting educational tourists in Britain

Greensboro-Guilford County, North Carolina, 201 Wastewater treatment system

Greensboro-Guilford County, North Carolina, 201 Wastewater treatment system

The Complete Wedding Music Collection

The Complete Wedding Music Collection

Address to Americans

Address to Americans

Report on the upper Tana River irrigation project by Kenya. Hydraulic Branch. Download PDF EPUB FB2

The Upper Tana Natural Resources Management project (UTaNRMP) is in its 4 th year of implementation and consequently at mid-term.

Share: by admin / 0 Comments. benefits to the non-target groups in the Upper Tana catchment through services and enterprises linked with the project activities, as well as to populations outside the catchment who rely on water and hydro-electricity from the river system. The project will also target other community areas like riverbanks, schools, hilltops, and.

Upper Tana Catchment Natural Resource Management Programme Supervision report - Mission dates: 17 March – 7 April 1 A. Introduction1 1. The supervision mission of the Upper Tana Catchment Natural Resource Management Programme (UTaNRMP) took place from 17th March to 7th April The objectives of the mission.

'Staff publications' is the digital repository of Wageningen University & Research Tana River irrigation project: reconnaissance report: soils: Author(s) Stolp, J.; Vleeshouwer, J.J. Login as Wageningen University & Research user or guest user in upper right hand corner of this : J.

Stolp, J.J. Vleeshouwer. ii Soil and Terrain conditions for the Upper Tana ISRIC Report /09 Foreword The Soil and Terrain (SOTER) database for the Upper Tana River catchment, at scaleis the second SOTER database for Kenya, after the first release of Kenya’s national SOTER database at.

include project reports, case studies, conference or workshop proceedings, discussion papers Baseline Review and Ecosystem Services Assessment of the Tana River Basin, Kenya Tracy Baker, Jeremiah Kiptala, Lydia Olaka, Naomi Oates, Asghar Hussain The Central Highlands region within the Upper Tana River Basin is the most.

BDR is a three year () project being implemented around the lower Tana River in Kenya and around the upper Aswa River in Uganda. The project is implementing IUCN’s Resilience Framework to climate variability and change, and is funded by the Austrian Development Cooperation.

The current area under irrigation is 4, acres with the current number of farming families (households) being 1, registered farmers therefore a population of about persons depend on this project for their scheme collapsed in when Tana River changed its course, and was revived inrehabilitation which was.

The project included an irrigation plan put together by engineer Khalifan Bakari, the Director of Irrigation Development Services Tana River County. “We are proud to be part of this project, which has not only solved the water problem in Wenje, but will also help save lives and improve health.

Upper Tana Natural Resources Management Project is an eight year project () funded by Government of Kenya, International Fund for Agricultural Development (IFAD), Spanish Trust Fund and the Local community.

The goal of the project is to “contribute to reduction of rural poverty in the Upper Tana river catchment”. Upper Tana, water users are mainly the electricity generating hydropower stations (Droogers et al.

; Kauffman et al. ) and a few downstream farms using River Tana water for irrigation. The associated hydrologic models. Stage 2. Grand Falls Hydropower Project. Farming Systems in the Middle and Lower Tana Basin. Draft Report. Nairobi: JICA and Nippon Koei Ltd.

JICA; and Nippon Koei Ltd. Initial environmental impact assessment. The proposed rehabilitation of the Bura and Hola irrigation schemes. Draft Report. Nairobi. JICA and Nippon Koei Co. by: 7. The Upper Tana catchment has been divi ded into sub-basins, for each of which a River Basin Management Plan has been proposed (MKEPand ).

Tana river. analysis using the Water Evaluation and Planning tool (WEAP). Green Water Credits Report 4, ISRIC – World Soil Information, Wageningen with members of the community living in the Tana River basin.

Green Water Credits Report 4. ii Analysis using WEAP tool Upper Tana, land cover in WEAP. 8 Figure 4: Observed and simulated stream. Soil and Terrain conditions for the Upper Tana River catchment, Kenya (Version ) Article (PDF Available) January with Reads How we measure 'reads'.

Tana Basin Area is geographically situated in the south eastern part of Kenya, lying between latitudes 0 o 30’ north and 2 o 30’ south, and longitudes 37 o 00’ east.

CONSERVATION STATUS AND DISTRIBUTON OF THE TANA RIVER RED COLOBUS AND CRESTED MANGABEY by Thomas M. Butynski PhD Senior Conservation Biologist Zoo Atlanta/Institute of Primate Research/National Museums of Kenya Geoffrey Mwangi MSc Research Division Kenya Wildlife Service Report for: Zoo Atlanta Kenya Wildlife Service National Museums of KenyaFile Size: 2MB.

The river is navigable by small craft for about miles ( km) upstream, often with difficulty. In the upper catchment, Sasumua Dam provides water for Nairobi. Kindaruma, at Seven Forks, is the site of a hydroelectric project, and an irrigation project at Embu provides water for rice cultivation.

kilometres to the Indian Ocean. The Tana River basin is divided into two distinct agro-ecological zones; the Upper Tana basin which receives more rainfall and is the predominant source of water while the Lower Tana basin is drier, flatter, and completely depends on the upper regions for river water flow.

Governor Amason Kingi has urged President Uhuru Kenyatta to hand over the multi-billion shillings Galana-Kulalu irrigation project to Kilifi and Tana River counties. The 1, kilometres ( mi) long Tana River is the longest river in Kenya, and gives its name to the Tana River County.

Its tributaries include the Thika, as well as several smaller rivers that flow only during the rainy river rises in the Aberdare Mountains to the west of lly it runs east before turning south around the massif of Mount Kenya.⁃ coordinates: 2°35′56″S 40°20′19″E / .Management Report and Recommendation 3 upper catchment of the Tana River and two watersheds of the Nzoia River catchment, the Kakamega Forest and Mt.

Elgon. The NRMP, a Specific Investment Loan, was approved by the Board of Directors in March and became effective on Decem Once it became effective, it was. The acreage to be irrigated was as follows: Upper Tana Basin at 93, acres Lower Tana (,), the Kano plains (,), Ewaso Nyiro (75,), Athi River .